The plan of (SCRB) for the year 2008
The cost of the projects mentioned in the (scrb)
plan for 2008 are estimated about
(1758
577 000) Thousand
dinar and annual budget (190
718 000) thousand
dinar and as follows.
1- The ongoing projects: evaluated cost (1
477 077
000) thousand dinar and annual budget
estimated (186 718
000) thousand diner including :-
A-
Second carriageways for the
main roads like ( Dakuk-Tooze, Kut- Nasseriya ,
Kalis – Ethaim , Kassak - Rabea'a and part of Mousul
- Dohook road (14km) ).
B-
Fixed bridges (Awasha ,
Kala'at Salih , Alwarar, Al Amerreia, Hadetha, Third
Baquba , Aljazeera, Iz AlDeen , Alsuwair , Third
Falluja and Osby Ban Gas ).
C-
Reconstruction of bridges
damaged by war activities ( Al-Fatha , Al-Abasiyat ,
Al-Qurna second Br. Kalid Bin Al-Waleed, Al-Qaqa'a ,
Al-Latefiya and bridge on Shat Al-Basra).
D-
Replacement of the floating
bridges with fixed ones ( Al-Fadliya ,
AL-Batha’a, Al-Sindiya, Al-Beayji ,
Al-Saqlawiya,Al-Rumana and Jewezrat ).
E-
New roads and intersections
(Al-Mahmodeia bypass, , Rawa – Al_Hathar road , 18.5
Km length road from Kalis- Ethaim, connect
Al-Ramady city with expressway No (1), Al-Zuhoor
interchange, Tel afat - Tel Abta and Kifil - Kassim)
F- a group of rural roads in the
governorrates.
G- Expressway No (1) sec. Diwaneia-
Nassereia - R/6 (Left & Right side) .
2- The new projects:- Total cost ( 259
500 000) thousand
dinar and annual
budget ( 4 000
000) thousand dinar including:-
A- Construction of fixed bridges ( Al-Karthiya
bridge and approaches).
B-Reconstruction of bridges damaged with war
activities( Al- Qayara, Palastin ,
Shinshal , Al-Quwair , Zghetoon, ,
ImamWais, Akarkuf ,Asky Mousul and Thira'a Dijla).
3- The projects funded by American grant: -
Its cost 240 million USD including :-
A-
Rural roads all over the
country with total length about 800km.
B- Al-Shirqat bridge and
approaches, Shaik Saad bridge, Al-Kuffa third
bridge, , accomplishment of railroad bridge ,
accomplishment of Zubba` oil field bridge,
C-
The second carriagway of
(Diwaneya- Samawa road ),
Accomplishment of Baghdad - Kirkuk second
carriageway .
4- Maintenance Plan :- The total budget for
maintenance for the year 2008 ( 58 milliard Dinar )
including ongoing projects from the last year
containing rehabilitation , maintenance, overlaying
, improving, widening roads all over the country as
well as the maintenance of floating and fixed
bridges in addition to the construction &
maintenance of culverts of different kinds. |